Case study — Leeds Climate Change Citizens’ Jury
Jurisdiction: Leeds / Leeds City Region, England. Updated: 2026-10-05. Evidence grading follows RESEARCH-METHOD.md. Labels: Observed (official/primary), Claimed (organiser self-description), Evaluation (external/academic), Analysis (Cicada synthesis), Open question.
1. Identity and jurisdiction
A citizens’ jury on climate change for Leeds, commissioned by the Leeds Climate Commission — an independent advisory body, not a statutory authority or the council itself. This makes it the clearest UK example in this corpus of a non-state-commissioned deliberative body advising a city (SRC-0051, SRC-0052).
2. Dates and legal/institutional basis
Observed: ran September–November 2019 as a commissioned exercise; no statutory basis (SRC-0051, SRC-0052). Designed and facilitated by Shared Future CIC; selection designed with the Sortition Foundation (SRC-0051, SRC-0052).
3. Purpose / question-setting
Observed: question — “What should Leeds do about the emergency of climate change?” — set by the commissioning Climate Commission (SRC-0051, SRC-0052).
4. Eligible population
Observed: residents across Leeds City Region (SRC-0051, SRC-0052).
5. Invitation frame
Observed: approximately 4,000 letters delivered to households via a civic-lottery design (SRC-0051, SRC-0052).
6. Recruitment and sortition method
Observed: two-stage civic lottery — random postal invitation, opt-in responses, stratified selection; selection design involved the Sortition Foundation (SRC-0051, SRC-0052).
7. Stratification criteria
Observed: reportedly included age, gender, ethnicity, area, disability/ability and climate attitudes (SRC-0051, SRC-0052).
8. Size and term
Observed: 25 jurors; approximately 30 hours of engagement across roughly eight weeks (SRC-0051, SRC-0052). Scale and duration are markedly smaller than the national assemblies — appropriate for the jury format.
9. Compensation / accessibility / support
Observed: the jury report records member-support arrangements; granular payment/expenses detail is not fully catalogued here (Open question) (SRC-0051).
10. Evidence and expert process
Observed: an oversight panel and invited commentators provided evidence; the jury could question witnesses (SRC-0051, SRC-0052).
11. Facilitation / deliberation
Observed: independent facilitation by Shared Future CIC (SRC-0051).
12. Decision / recommendation method
Observed: produced a closing statement and 12 recommendations agreed by the jury (SRC-0051).
13. Mandate and recipient institution
Observed: advisory; addressed publicly to the city — principally Leeds City Council and the Leeds Climate Commission’s partner institutions (SRC-0051, SRC-0052).
14. Required response / follow-up
Observed: Leeds City Council agreed to provide a formal response to the jury’s recommendations — a voluntary administrative commitment rather than a legal duty (SRC-0051, SRC-0052). Secondary reporting records early tension between jury recommendations (notably on airport expansion) and council positions (SRC-0053).
15. Transparency and participant privacy
Observed: full jury report published including the process description (SRC-0051).
16. Outcomes / implementation evidence
Observed: 12 recommendations published; council committed to respond; jury opposition to airport expansion reported widely (SRC-0051, SRC-0053). Open question: documented conversion of recommendations into adopted council policy is limited in retrieved sources.
17. Critiques / limitations
- Analysis: commissioning by a non-statutory body weakens the formal accountability chain — the council is a voluntary respondent.
- Secondary reporting suggests divergent council/jury positions (airport expansion), illustrating that a formal response does not equal adoption (SRC-0053).
- Analysis: citizens’ jury scale (25 members, ~30 hours) trades depth and diversity capacity against cost/speed — terminology should not be collapsed with larger citizens’ assemblies.
18. Software / operational tools
Observed: none catalogued beyond the civic-lottery recruitment process itself.
19. Sources
- SRC-0051 — Shared Future CIC, Leeds Climate Change Citizens’ Jury — report (primary project/practitioner record).
- SRC-0052 — Leeds Climate Commission jury documentation (commissioning authority).
- SRC-0053 — LGC secondary reporting on airport-expansion friction.
20. Cicada relevance / open questions
- Demonstrates the small jury form (25 members) and a non-state commissioner — expands the commissioner-type dimension of the landscape.
- The airport-expansion episode is useful evidence that “formal response committed” and “recommendation adopted” are separable states worth modelling distinctly.
- Open questions: compensation detail; response-tracking artefacts; longer-term uptake.